Quantcast
Cabane_Const.jpg
N

Cabane_Const.jpg

Jig has been set, aligned left to right and front to back as nesc. An electronic level was used to verify the 1.5 deg angle between bushings only after the fuselage was set and shimmed level on the floor.
There are no comments to display.

Media information

Category
General Biplane Photos
Album
Cabane Construction
Added by
NickyP
Date added
View count
312
Comment count
0
Rating
0.00 star(s) 0 ratings

Share this media

Top