Quantcast
Cabane_Const6.jpg
N

Cabane_Const6.jpg

After we built and tacked into place the cabanes we dropped 2 plum bobs from the front and back bushings (with a rod in place through them) and checked against string line from tail to firewall down fuselage center line. Looks real good hear.
There are no comments to display.

Media information

Category
General Biplane Photos
Album
Cabane Construction
Added by
NickyP
Date added
View count
374
Comment count
0
Rating
0.00 star(s) 0 ratings

Share this media

Top