I started building this Skybolt 8 years ago, but life got in the way and haven't worked on in since I bought a flying plane 7 1/2 years ago. Im moving in a couple months so Im cleaning out the hangar. For sale are:
1. Set of Skybolt D plans
2. Fuselage tack welded together, 1/2 of it is finish welded. I never put any protectant on the tubing when I quit working on it, but its been in a hangar in the desert, so corrosion is minimal. I understand this is probably worthless, but I thought I'd try to get rid of it instead of send it for scrap.
3. Pre cut tail rib kit from Steen aero:
https://secure.steenaero.com/Store/site/product.cfm?id=70423B93-102E-BB20-1DC38E9D7B37AC6F
4. Assorted steel tubing from Aircraft spruce (probably $500 or so worth of tubing)
Im asking $200 Or best offer for everything. Im Located in Southern CA near Edwards AFB
1. Set of Skybolt D plans
2. Fuselage tack welded together, 1/2 of it is finish welded. I never put any protectant on the tubing when I quit working on it, but its been in a hangar in the desert, so corrosion is minimal. I understand this is probably worthless, but I thought I'd try to get rid of it instead of send it for scrap.
3. Pre cut tail rib kit from Steen aero:
https://secure.steenaero.com/Store/site/product.cfm?id=70423B93-102E-BB20-1DC38E9D7B37AC6F
4. Assorted steel tubing from Aircraft spruce (probably $500 or so worth of tubing)
Im asking $200 Or best offer for everything. Im Located in Southern CA near Edwards AFB