• The Biplane Forum is a large global active community of biplane builders, owners and pilots. From Pitts to Skybolts, to older barnstormers, all types are welcome. In addition to our active community, our content boasts exhaustive technical information which is often sought after for projects and maintenance. This information has accumulated over the 12+ years the forum has been in existence.

    The Biplane Forum is a private community. Subscriptions are only $49.99/year or $6.99/month to gain access to this great community and unmatched source of information not found anywhere else on the web. We are also a great resource for non biplane users, since many GA aircraft are built the same way (fabric and tube construction). Annual membership also comes with two BiplaneForum.com decals.



Starduster SA300 Plan List

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

mattg

Member
*
Joined
Jul 8, 2018
Messages
12
Reaction score
1
Location
UK
Hi guys,

Finally making headway on my project, hoping to post some pictures of her soon 🤞

Looking through my old plans, I have a few gaps in them...... researching previous threads on here I've found some answers and created a excel document to try and make sense of it, but sadly created more questions! Now unsure if I need to purchase a new (updated?) set of plans from ACS, or if what I have is the standard which you guys work with?

Here's what I have:

Drawings List (I've included the dates and EC Numbers)

Sheet No.
Description
Notes
Date
EC NO.
Overview
Detailed diagram
1
Intro, info, spec
6-30-66​
2
Wing Lower - RH Shown
8-6-65​
“A” DEC 69​
3
Wing Upper - RH Shown
8-6-65​
12/18/69​
4
Wing Spars
8-6-65​
12/18/69​
5
Trailing Edge & Wing tip
8-6-65​
12/20/69​
6
Centre Wing & wing fittings
8-6-65​
12/20/69​
6a
Wing fitting hole dimensions 81/2 x 11” 2 sheetsDon’t have
7
Aileron Small sheet 8 1/2 x 11”
8-6-65​
12/17/69​
7a
Aileron Fittings - Forward mounted slave strut
9-1-88​
8
Ribs - full size
8-6-65​
8a
Ribs (top wing)
8-6-65​
9
Fuselage fairings
11-12-65​
12/16/69​
10
Vertical fin rudder, stabiliser & elevator
9-29-65​
“A” DEC 15/69​
10a
Mounting ears - stabiliser material change 8 1/2 x 11”Don’t have
11
Fuselage stations
9-18-65​
12
Cabane strut & Interplane struts
2-12-66​
12/19/69​
13
Fuselage - Controls, Rudder, Brakes
4-16-66​
12/22/69​
13a
Rod end modification 8 1/2 x 11”Don’t have
14
small sheet landing gear 11 x 17”
11-5-75​
14a
8 1/2 x 11” Landing Gear
have pdf​
11-5-75 modified​
15
General arrangement
6-30-66​
12/20/69​
15a
Weld-in hardware substitution 8 1/2 x 11”Don’t have
15b
Hardware update two sheets 8 1/5 x 11”Don’t have
16 Front
Seats, Brakes & Tank instl.
9-1-76​
16 Back
Seats, Brakes, Tank and Tail wheel Instl - Materials
9-1-76​
16a
Fuel system schematic
have pdf​
7-16-80​
Starduster Magazine
Fuel Tanks Install and Inverted System
7-16-80​
17
Engine Mount - Now Obsolete
have pdf​
2-25-67​
18
Firewall, Fuselage Cover
10-15-66​
19
Cowling
1-22-67​
20Centre Section with Fuel TankDon’t have


Material Lists

Sheet No.
Description
Notes
Date
1
?Don’t have
2
Lower Wing LH and RH
March 1973​
3
Top Wing LH and RH
4,5,6
Spars, Trailing Edge & Bow, centre Section
have pdf​
7, 8, 8a
7. Aileron, 8&8a. Ribs
9
Fuselage Fairings
10, 11, 12
10. Elevator, Stabiliser, Rudder - 11. Fuselage - 12. Cabane Struts, I Struts
13, 15
Material list: 13. Controls - 15.Flight Surface Installation
15 &15b
Flight Surfaces Don’t have
16
?Don’t have
17
?Don’t have
18
?Don’t have
19
?Don’t have
20
Centre Section

Thanks in advance for your thoughts,

Matt
 

Latest posts

Back
Top