• The Biplane Forum is a large global active community of biplane builders, owners and pilots. From Pitts to Skybolts, to older barnstormers, all types are welcome. In addition to our active community, our content boasts exhaustive technical information which is often sought after for projects and maintenance. This information has accumulated over the 12+ years the forum has been in existence.

    The Biplane Forum is a private community. Subscriptions are only $49.99/year or $6.99/month to gain access to this great community and unmatched source of information not found anywhere else on the web. We are also a great resource for non biplane users, since many GA aircraft are built the same way (fabric and tube construction). Annual membership also comes with two BiplaneForum.com decals.



Struts, lines and cables

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

garyg

Well-Known Member
Lifetime Supporter
Joined
Nov 2, 2011
Messages
1,103
Reaction score
345
Trying to line up the final welding and I am in need of [constant] advice....

I am looking at the horizontal stabilizer supports. The S1-11 drawings call for fixed struts and are not adjustable. This means a certain exactness that might be tough. Obviously it would be tough to rig the plane and then ship it out to have them made, so as designed, I need to have them made locally. I have 2 questions. I dont understand the drawings on how the streamline tubing forms the ends. The ends in drawings are called doublers. This suggests that the streamline is bent first and then doublers are welded on. This seem incorrect. At least on one end. Is the streamline split and the bent and welded? Is there any instructions about making these things beyond the drawings?

Is there any reasons why these dont have an adjustable end? The S2B shows them as adjustable (https://aviataircraft.com/pix/S2BPartsCatalog.pdf). Any reason why they shouldnt be adjustable?

We have Whitman gear legs as per Wolf drawings. The trouble is the drawings dont elaborate on the brake line routing. The drawings for the spring gear have brackets for the flex line (to master cylinder) to the fixed line (going down spring gear). This bracket is not duplicated or specified in the leg drawings. Anyone know what the plan was for replacing that bracket when installing gear legs?

Certainly not last but.....when installing a A-930 push pull control, how are the cable housing ends suppose to be held. The pictures are not clear and I cant find how they are retained.

thanks,
gary g
 

Latest posts

Back
Top