cajunflyer
Well-Known Member
- Joined
- Dec 13, 2010
- Messages
- 53
- Reaction score
- 3
I'm still fairly new to the "build your own plane" world, and I have a question about construction logging. How much is enough? At this point I am keeping a detailed (written) construction log, but I'm really only stopping to take pictures of things that either a) won't be visible for later inspection, b) I feel show significant milestones in the construction effort, or c) show where I have done anything that isn't 100% as drawn on the plans.Thoughts?