• The Biplane Forum is a large global active community of biplane builders, owners and pilots. From Pitts to Skybolts, to older barnstormers, all types are welcome. In addition to our active community, our content boasts exhaustive technical information which is often sought after for projects and maintenance. This information has accumulated over the 12+ years the forum has been in existence.

    The Biplane Forum is a private community. Subscriptions are only $49.99/year or $6.99/month to gain access to this great community and unmatched source of information not found anywhere else on the web. We are also a great resource for non biplane users, since many GA aircraft are built the same way (fabric and tube construction). Annual membership also comes with two BiplaneForum.com decals.



Skybolt Cabane

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

wandersen

Well-Known Member
Joined
Jul 31, 2007
Messages
519
Reaction score
140
Cut the streamlined tubing last week and fitted up the cabane. This weekend, welded everything up.

On the right side, there is the removable cross-member to allow installation of the fuel tank. There are 0.100" tabs welded to the streamline tubing to attach the removable streamline member.

Should these tabs be welded on one side, or on both sides? Somewhere I thought I saw a note that these should be welded on both sides. I can't seem to find that note. Can anyone offer advise?

I will likely build this similar to the firebolt plans with a bushing installed in the streamline at the top, and squish the streamline to the tab at the bottom.

Thanks,

Ward

PS - Anyone want to see the construction photos?

Lower tab back.jpg


lower tab front.jpg
 
Last edited:

Latest posts

Back
Top