- Joined
- Sep 7, 2009
- Messages
- 7,612
- Reaction score
- 5,772
so my tubing kit for my as2 came today. fuselage, engine mount, tail and ribs, and landing gear. when i opened the box i was amazed at its contents. looking at the tube list on the drawings i was sent didnt seem to have the same impression of 200 some tubes in the box! each one has its part number on it and the assembly it belongs to. stab leading edges, elevator and rudder trailing edges pre bent, as well as the compound bend for the fin leading edge with the offset prebent. the time its going to save is unbelievable and how accurate an airframe its going to produce. so im putting a big plug out there to don and everyone at VR3, if you can swing the cost of one of these kits for your project its money very, very well spent! thanks don!!!
chris
Edited by: smizo