• The Biplane Forum is a large global active community of biplane builders, owners and pilots. From Pitts to Skybolts, to older barnstormers, all types are welcome. In addition to our active community, our content boasts exhaustive technical information which is often sought after for projects and maintenance. This information has accumulated over the 12+ years the forum has been in existence.

    The Biplane Forum is a private community. Subscriptions are only $49.99/year or $6.99/month to gain access to this great community and unmatched source of information not found anywhere else on the web. We are also a great resource for non biplane users, since many GA aircraft are built the same way (fabric and tube construction). Annual membership also comes with two BiplaneForum.com decals.



over engineered?

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

darylat8750

Well-Known Member
Joined
Jun 20, 2008
Messages
2,176
Reaction score
93
Cute story. I think we have all seen and or done this sort of thing. :eek:

Value Engineering


You don't have to be an engineer to appreciate this story.



A toothpaste factory had a problem. They sometimes shipped empty boxes without the tube inside. This challenged their perceived quality with the buyers and distributors. Understanding how important the relationship with them was, the CEO of the company assembled his top people. They decided to hire an external engineering company to solve their empty boxes problem. The project followed the usual process: budget and project sponsor allocated, RFP, and third-parties selected. Six months (and $8 million) later they had a fantastic solution - on time, on budget, and high quality. Everyone in the project was pleased.



They solved the problem by using a high-tech precision scale that would sound a bell and flash lights whenever a toothpaste box weighed less than it should. The line would stop, someone would walk over, remove the defective box, and then press another button to re-start the line. As a result of the new package monitoring process, no empty boxes were being shipped out of the factory.



With no more customer complaints, the CEO felt the $8 million was well spent. He then reviewed the line statistics report and discovered the number of empty boxes picked up by the scale in the first week was consistent with projections, however, the next three weeks were zero! The estimated rate should have been at least a dozen boxes a day. He had the engineers check the equipment, they verified the report as accurate.


Puzzled, the CEO traveled down to the factory, viewed the part of the line where the precision scale was installed, and observed just ahead of the new $8 million dollar solution sat a $20 desk fan blowing the empty boxes off the belt and into a bin. He asked the line supervisor what that was about.



"Oh, that," the supervisor replied, "Bert, the kid from maintenance, put it there because he was tired of walking over every time the bell rang."
 